Skip to main content
Loading…
This section is included in your selections.

Whenever street reconstruction has occurred within the 36 months immediately preceding a permit request, the permittee shall resurface the entire street within the limits of the longitudinal excavation.

Whenever street reconstruction has occurred within the last five years but not less than three years preceding the permit request, permittee shall resurface the half street within the limits of the longitudinal excavation.

Whenever a street is slurry sealed within the past one year immediately preceding a permit request, the permittee shall resurface the entire street within the limits of the longitudinal excavation.

Whenever a street is slurry sealed within the past three years but not less than one year preceding the permit request, permittee shall slurry seal the half street within the limits of the longitudinal excavation.

The above noted provisions may be waived by the city council in cases in which the city engineer has determined that there are exceptional circumstances warranting such a waiver. (Ord. 566 § 2; Ord. 443 § 2. 2002 Code § 13-1.3).