Skip to main content
Loading…
This section is included in your selections.

A. Development Review Required. A development review permit must be obtained prior to the issuance of any permit for the construction of any building or structure. Major and minor development review is required as specified in Table 20.84-2:

Table 20.84-2. Review Authority for Development Review (DR) Permit and Zoning Clearance

Role of Review Authority

Zoning Clearance*

Director

(Minor DR)

Planning Commission

(Major DR)

City Council

RESIDENTIAL CONSTRUCTION AND IMPROVEMENTS

Single-family residential construction, including:

a. New construction and expansions over 50 percent of existing floor area

b. Expansions under 50 percent, façade improvements, and accessory structures visible from the public street

c. All second story additions

d. Accessory dwelling units

Decision

Appeal

Single-family residential construction, including:

a. Expansions less than 50 percent of existing floor area, façade improvements, and accessory structures not visible from the public street

b. Conversions of existing living area in existing structures to an accessory dwelling unit

Decision

Appeal

Multifamily residential

a. Expansion, including accessory structures and second stories up to a maximum of 50 percent of the existing gross floor area, but no additional dwelling units

b. Second stories, proposing up to a maximum of 2 dwelling units

c. Fences or walls on projects with up to 2 dwelling units, proposing a fence within the front yard setback over 42 inches in height

d. Façade improvements

Decision

Appeal

Multifamily residential

a. New construction, including second stories, proposing 3 or more dwelling units

b. Expansion, including accessory structures and second stories, over 50 percent of the existing gross floor area

c. Fences or walls with 3 or more dwelling units, proposing a fence within the front yard setback over 42 inches in height

Decision

Appeal

NONRESIDENTIAL CONSTRUCTION AND IMPROVEMENTS

a. Expansion, including accessory structures, not visible from the public right-of-way, up to a maximum of 50 percent of the existing gross floor area

b. Façade improvements visible from the public street

Decision

Appeal

a. New construction

b. Expansion, including accessory structures, visible from the public right-of-way, over 50 percent of the existing gross floor area

Decision

Appeal

a. Expansions not visible from the public right-of-way involving less than 50 percent of the existing gross floor area

b. Façade improvements not visible from the public street

Decision

Appeal

FENCES AND WALLS

Fences and walls, except as specified below

Decision

Appeal

SIGNS AND MASTER SIGN PROGRAMS

Sign permits and master sign programs – staff level in compliance with CMC 20.72.040(C)(1)

Decision

Appeal

Master sign programs – planning commission in compliance with CMC 20.72.040(C)(2)

Decision

Appeal

OTHER TYPES OF CONSTRUCTION AND IMPROVEMENTS

Nonconforming structure additions/expansions as allowed by CMC 20.80.010(C)

Decision

Appeal

Parking lot and/or landscaping modifications

Decision

Appeal

Solar collection systems located on the roof of an existing structure

Decision

Appeal

Home occupation permits

Decision

Appeal

*See Chapter 20.84 CMC, Part 3 for description of zoning clearance.

B. Discretionary Permits. Applications for development review, both major and minor, are considered discretionary projects subject to the requirements of CEQA. If a minor development review permit triggers a negative declaration, mitigated negative declaration, or environmental impact report, the project shall be referred to the planning commission for review and approval. (Ord. 690 § 4 (Exh. A), 2018).