Skip to main content
Loading…
This section is included in your selections.

A. Dust and Paint. All uses, including grading, construction, and operational phases, shall be conducted in a manner so as to prevent dust emissions and paint overspray from creating hazardous or potentially hazardous conditions within the site and surrounding area.

B. Dust Control. Parcels located within the soil erosion control area are required to obtain dust control permits from the building department prior to commencement of grading operations. (Ord. 690 § 4 (Exh. A), 2018).